logo
English
Contact Us

Contact Person : Alice Gu

Phone Number : 86-15862615333

WhatsAPP : +8615862615333

Free call

3 In 1 Monoblock 20 Ltr Water Jar Filling Machine

Minimum Order Quantity : 1 set Price : USD $6000/set
Packaging Details : wooden case Delivery Time : 15-20 working days
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability : 20 sets/month
Place of Origin: ZhangJiaGang JiangSu China Brand Name: FILL PACK
Certification: CE, ISO9001 Model Number: QGF-300

Detail Information

Control: PLC Power: 6KW
Material: SS Automatic Grade: Automatic
Bottle Size: 20l Capacity: 300BPH
Dimension(L*W*H): 3400*1000*1750 Condition: New
Highlight:

300 BPH Gallon Filling Machine

,

Monoblock 300 BPH Gallon Filling Line

Product Description

20L filling machine with rinsing filling capping 3 in 1 monoblock function auto output conveyor system

 

20L filling machine is integrated washing filling and capping together.

It is ideal machine to produce barrel water.

The whole 20L filling machine is using stainless steel 304 ,rot resistant,can be cleaned easily.

Main electric parts are all branded. Air channel system use Air TAC brand product.

The 20L filling machine is with compact construction,will occupy small room,working efficiency is high.

Only need 2 operators to control, is a good choice for factory to choose.

The 20L filling machine set up do not need plug floor screw,after case taking off,set the 20L filling machine on the flat floor,and then adjust stand height and adjust all stand pressure to be average.

After the 20L filling machine is set up well, get in through water pipe, drain pipe and power , air power.

 

Working process:

20L filling machine can be divided into 3 steps: washing, filling and capping, total 36 working stations,working process as below:

1) Set empty barrel mouth to barrel seat, empty barrel will be washed during headstand situation,4 working station for barrel inserting.

2) Washing process will be divided into 4 steps:

1, hot alkali water washing 2,thimerosal washing; 3,clean water washing,4,pure water washing.Every washing step is set to 8S,after washing,there will be 10S for dripping.

3) The 20L filling machine will move down 45 degree through the passing chain and will passing out chain and turn over 45 degree by barrel lift cylinder to filling position for filling.

4) Filling value will driven by cylinder to insert into barrel and start to fill, filling time is controlled by PLC, and filling time is adjustable by control panel according to filling liquid surface.

After filling, the extra water will back to pure water tank by automatic vent,20L filling machine can reduce water consumption.(water tank is not included)

5) After filling process finish,the filled barrel will be pushed to capping position by barrel stop cylinder,the whole process finish till now.

 

Spare parts for free:

Sealing ring for filling valves*1suit

 

Recommended Spare parts list:

NO. Items Qty. Price(USD)
1 Sealing ring for filling valves 1suit For free
2 Bucket holder 2pcs 6.8
3 Cap pressing mould 1pcs 5
4 Air switch 1pcs 17
5 Contactor 1pcs 14
6 Solenoid valve 1pcs 27
 

 

Parameters:

Cylinder Air tech-Taiwan
Magnetic valve Air tech-Taiwan
Rising pump-filling pump Nanfang
Motor TWT Taiwan
PLC Mitsubishi Japanse
Power 5.3KW
Dimension 3400*1000*1750mm
Weight 500kg

 

3 In 1 Monoblock 20 Ltr Water Jar Filling Machine 0

Auto cap pressing Cylinder

3 In 1 Monoblock 20 Ltr Water Jar Filling Machine 1

 

Auto belt conveyor system

3 In 1 Monoblock 20 Ltr Water Jar Filling Machine 2

Packing & Delivery

1. the 20L filling machine is packed by wooden case.
2. The delivery date of gallon bottle water filling machine is within 30 days after payment.

 

1. installation&commissioning

After the 20L filling machine arrived at the customer's site. the customer is responsible for unpacking and arranging the equipment according to the placement drawing;Our technician will do equipment set up and commissioning,buyer should offer necessary help if needed

 

2. Training

We are responsible for offering the technical training to user.Through training,users' technical staff can grasp and the skill of operation and maintenance proficiently.The buyer also can send staff to our company for learning.

 

3. Quality assurance

The warranty period is 12 months after acceptance chech of the production line.if there is any different between the furnished equipment in the customer's factory and the equipment concerned in the contract.

You Might Be Into These
Get in touch with us

Enter Your Message

dm@fillpackmachine.com
+8615862615333
AliceFillpack
86-15862615333
1242295712
86-15862615333