Double Row Rinsing SUS304 300 BPH Gallon Water Plant
Contact Person : Alice Gu
Phone Number : 86-13862320828
WhatsApp : +8615862615333
Minimum Order Quantity : | 1 set | Price : | USD $6000/set |
---|---|---|---|
Packaging Details : | wooden case | Delivery Time : | 15-20 working days |
Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability : | 20 sets/month |
Place of Origin: | ZhangJiaGang JiangSu China | Brand Name: | FILL PACK |
---|---|---|---|
Certification: | CE, ISO9001 | Model Number: | QGF-300 |
Detail Information |
|||
Power: | 5.3KW | Weight: | 500kg |
---|---|---|---|
Dimension(L*W*H): | 3400*1000*1750mm | Capacity: | 300B/h |
Bottle Size: | 18.9L | Control: | PLC |
Material: | Stainless Steel 304 | Condition: | New |
High Light: | 300 BPH 5 Gallon Bottle Filler,SUS304 Gallon Bottle Filler |
Product Description
SUS304 material 5 Gallon filling equipment QGF-300 model with two caps sorters
5 Gallon filling equipment is integrated washing filling and capping together.
It is ideal machine to produce barrel water.
The whole 5 Gallon filling equipment is using stainless steel 304 ,rot resistant,can be cleaned easily.
Main electric parts are all branded. Air channel system use Air TAC brand product.
The 5 Gallon filling equipment is with compact construction,will occupy small room,working efficiency is high.
Only need 2 operators to control, is a good choice for factory to choose.
The 5 Gallon filling equipment set up do not need plug floor screw,after case taking off,set the 5 Gallon filling equipment on the flat floor,and then adjust stand height and adjust all stand pressure to be average.
After the 5 Gallon filling equipment is set up well, get in through water pipe, drain pipe and power , air power.
Working process:
5 Gallon filling equipment can be divided into 3 steps: washing, filling and capping, total 36 working stations,working process as below:
1) Set empty barrel mouth to barrel seat, empty barrel will be washed during headstand situation,4 working station for barrel inserting.
2) Washing process will be divided into 4 steps:
1, hot alkali water washing 2,thimerosal washing; 3,clean water washing,4,pure water washing.Every washing step is set to 8S,after washing,there will be 10S for dripping.
3) The barrel after washing will move down 45 degree through the passing chain and will passing out chain and turn over 45 degree by barrel lift cylinder to filling position for filling.
4) Filling value will driven by cylinder to insert into barrel and start to fill, filling time is controlled by PLC, and filling time is adjustable by control panel according to filling liquid surface.
After filling, the extra water will back to pure water tank by automatic vent,5 Gallon filling equipment can reduce water consumption.(water tank is not included)
5) After filling process finish,the filled barrel will be pushed to capping position by barrel stop cylinder,the whole process finish till now.
Spare parts for free:
Sealing ring for filling valves*1suit
Recommended Spare parts list:
NO. | Items | Qty. | Price(USD) |
1 | Sealing ring for filling valves | 1suit | For free |
2 | Bucket holder | 2pcs | 6.8 |
3 | Cap pressing mould | 1pcs | 5 |
4 | Air switch | 1pcs | 17 |
5 | Contactor | 1pcs | 14 |
6 | Solenoid valve | 1pcs | 27 |
Parameters:
Cylinder | Air tech-Taiwan |
Magnetic valve | Air tech-Taiwan |
Rising pump-filling pump | Nanfang |
Motor | TWT Taiwan |
PLC | Mitsubishi Japanse |
Power | 5.3KW |
Dimension | 3400*1000*1750mm |
Weight | 500kg |
Caps sorters
Packing & Delivery
1. the5 Gallon filling equipment is packed by wooden case.
2. The delivery date of gallon bottle water filling machine is within 30 days after payment.
1. installation&commissioning
After the 5 Gallon filling equipment arrived at the customer's site. the customer is responsible for unpacking and arranging the equipment according to the placement drawing;Our technician will do equipment set up and commissioning,buyer should offer necessary help if needed
2. Training
We are responsible for offering the technical training to user.Through training,users' technical staff can grasp and the skill of operation and maintenance proficiently.The buyer also can send staff to our company for learning.
3. Quality assurance
The warranty period is 12 months after acceptance chech of the production line.if there is any different between the furnished equipment in the customer's factory and the equipment concerned in the contract.
Enter Your Message